All airlines flying from Oran (ORN) to Alicante (ALC).

Ad box here 7322741189 I FlightInfo Top Box
Select flight date:
FLIGHT SCHEDULE
Direct Flights:
Tue 13:00 Oran (ORN) 15:00 Alicante (ALC)
Air Algerie AH 2016 Non-stop Boeing 737-800 (73H) 1:00 Effective 2025-06-17 through 2025-09-09
Fri 13:15 Oran (ORN) 15:05 Alicante (ALC)
Air Algerie AH 2016 Non-stop Boeing 737-800 (73H) 0:50 Effective 2025-06-20 through 2025-09-12
Daily 15:20 Oran (ORN) 17:20 Alicante (ALC)
Air Algerie AH 2016 Non-stop Boeing 737-800 (73H) 1:00 Valid until 2025-06-14
Mon,Sat 15:20 Oran (ORN) 17:20 Alicante (ALC)
Air Algerie AH 2016 Non-stop Boeing 737-800 (73H) 1:00 Effective 2025-06-16 through 2025-09-13
Daily 15:20 Oran (ORN) 17:20 Alicante (ALC)
Air Algerie AH 2016 Non-stop Boeing 737-800 (73H) 1:00 Effective 2025-09-14 through 2025-10-25
Daily 15:20 Oran (ORN) 17:20 Alicante (ALC)
Air Algerie AH 2016 Non-stop Boeing 737-800 (73H) 2:00 Effective from 2025-10-26
Thu 18:55 Oran (ORN) 20:45 Alicante (ALC)
Air Algerie AH 2016 Non-stop Boeing 737-800 (73H) 0:50 Effective 2025-06-19 through 2025-09-11
Sun 19:35 Oran (ORN) 21:25 Alicante (ALC)
Air Algerie AH 2016 Non-stop Boeing 737-800 (73H) 0:50 Effective 2025-06-15 through 2025-09-07
Wed 20:55 Oran (ORN) 22:45 Alicante (ALC)
Air Algerie AH 2016 Non-stop Boeing 737-800 (73H) 0:50 Effective 2025-06-18 through 2025-09-10
Thu 14:40 Oran (ORN) 16:40 Alicante (ALC)
Air Algerie AH 2020 Non-stop Boeing 737-600 (736) 1:00 Effective 2025-06-19 through 2025-09-11
Thu-Sat 19:20 Oran (ORN) 21:20 Alicante (ALC)
Air Algerie AH 2020 Non-stop Boeing 737-800 (73H) 1:00 Valid until 2025-06-14
Fri 19:20 Oran (ORN) 21:20 Alicante (ALC)
Air Algerie AH 2020 Non-stop Boeing 737-800 (73H) 1:00 Effective 2025-06-20 through 2025-09-12
Thu-Sat 19:20 Oran (ORN) 21:20 Alicante (ALC)
Air Algerie AH 2020 Non-stop Boeing 737-800 (73H) 1:00 Effective 2025-09-18 through 2025-10-25
Thu-Sat 19:20 Oran (ORN) 21:20 Alicante (ALC)
Air Algerie AH 2020 Non-stop Boeing 737-800 (73H) 2:00 Effective from 2025-10-30
Sat 19:40 Oran (ORN) 21:40 Alicante (ALC)
Air Algerie AH 2020 Non-stop Boeing 737-800 (73H) 1:00 Effective 2025-06-21 through 2025-09-13
Sun 07:25 Oran (ORN) 09:30 Alicante (ALC)
Vueling VY 6031 Non-stop Airbus A320 (320) 1:05 Effective 2025-09-21 through 2025-10-05
Tue 07:35 Oran (ORN) 09:40 Alicante (ALC)
Vueling VY 6031 Non-stop Airbus A320 (320) 1:05 Effective 2025-06-24 through 2025-09-09
Thu 07:55 Oran (ORN) 10:00 Alicante (ALC)
Vueling VY 6031 Non-stop Airbus A320 (320) 1:05 Valid until 2025-06-12
Thu 07:55 Oran (ORN) 10:00 Alicante (ALC)
Vueling VY 6031 Non-stop Airbus A320 (320) 1:05 Effective 2025-09-18 through 2025-10-23
Tue 15:50 Oran (ORN) 17:55 Alicante (ALC)
Vueling VY 6031 Non-stop Airbus A320 (320) 1:05 Effective 2025-09-16 through 2025-09-30
Sat 21:15 Oran (ORN) 23:20 Alicante (ALC)
Vueling VY 6031 Non-stop Airbus A320 (320) 1:05 Valid until 2025-06-14
Sat 21:15 Oran (ORN) 23:20 Alicante (ALC)
Vueling VY 6031 Non-stop Airbus A320 (320) 1:05 Effective 2025-09-20 through 2025-10-25
Sat 21:35 Oran (ORN) 23:40 Alicante (ALC)
Vueling VY 6031 Non-stop Airbus A320 (320) 1:05 Effective 2025-06-21 through 2025-09-13
Thu 21:40 Oran (ORN) 23:45 Alicante (ALC)
Vueling VY 6031 Non-stop Airbus A320 (320) 1:05 Effective 2025-06-19 through 2025-09-11
Wed,Fri,Sun 23:10 Oran (ORN) 01:15 Alicante (ALC)
Vueling VY 6031 Non-stop Airbus A320 (320) 1:05 Effective 2025-06-20 through 2025-09-14
The flight arrives 1 day after departure.
Tue 00:55 Oran (ORN) 03:00 Alicante (ALC)
Vueling VY 6033 Non-stop Airbus A320 (320) 1:05 Effective 2025-06-24 through 2025-09-09
Direct Codeshare Flights:
Sun 07:25 Oran (ORN) 09:30 Alicante (ALC)
Iberia IB 5681 Non-stop Airbus A320 (320) 1:05 Effective 2025-09-21 through 2025-10-05
Codeshare flight, operated by Vueling.(VY 6031)
Tue 07:35 Oran (ORN) 09:40 Alicante (ALC)
Iberia IB 5681 Non-stop Airbus A320 (320) 1:05 Effective 2025-06-24 through 2025-09-09
Codeshare flight, operated by Vueling.(VY 6031)
Thu 07:55 Oran (ORN) 10:00 Alicante (ALC)
Iberia IB 5681 Non-stop Airbus A320 (320) 1:05 Valid until 2025-06-12
Codeshare flight, operated by Vueling.(VY 6031)
Thu 07:55 Oran (ORN) 10:00 Alicante (ALC)
Iberia IB 5681 Non-stop Airbus A320 (320) 1:05 Effective 2025-09-18 through 2025-10-23
Codeshare flight, operated by Vueling.(VY 6031)
Tue 15:50 Oran (ORN) 17:55 Alicante (ALC)
Iberia IB 5681 Non-stop Airbus A320 (320) 1:05 Effective 2025-09-16 through 2025-09-30
Codeshare flight, operated by Vueling.(VY 6031)
Sat 21:15 Oran (ORN) 23:20 Alicante (ALC)
Iberia IB 5681 Non-stop Airbus A320 (320) 1:05 Valid until 2025-06-14
Codeshare flight, operated by Vueling.(VY 6031)
Sat 21:15 Oran (ORN) 23:20 Alicante (ALC)
Iberia IB 5681 Non-stop Airbus A320 (320) 1:05 Effective 2025-09-20 through 2025-10-25
Codeshare flight, operated by Vueling.(VY 6031)
Sat 21:35 Oran (ORN) 23:40 Alicante (ALC)
Iberia IB 5681 Non-stop Airbus A320 (320) 1:05 Effective 2025-06-21 through 2025-09-13
Codeshare flight, operated by Vueling.(VY 6031)
Thu 21:40 Oran (ORN) 23:45 Alicante (ALC)
Iberia IB 5681 Non-stop Airbus A320 (320) 1:05 Effective 2025-06-19 through 2025-09-11
Codeshare flight, operated by Vueling.(VY 6031)
Wed,Fri,Sun 23:10 Oran (ORN) 01:15 Alicante (ALC)
Iberia IB 5681 Non-stop Airbus A320 (320) 1:05 Effective 2025-06-20 through 2025-09-14
Codeshare flight, operated by Vueling.(VY 6031)
The flight arrives 1 day after departure.
Tue 00:55 Oran (ORN) 03:00 Alicante (ALC)
Iberia IB 5683 Non-stop Airbus A320 (320) 1:05 Effective 2025-06-24 through 2025-09-09
Codeshare flight, operated by Vueling.(VY 6033)
Ad flat here 8924483383 I FlightInfo Lower
Parallax here ORN-ALC


All airlines flying from Oran (ORN) to Alicante (ALC).
Ad mobi flat here (320x100px) 9629219771 M FlightInfo Top Flat
Select flight date:
FLIGHT SCHEDULE
Direct Flights:

Effective 2025-06-17 through 2025-09-09
Mon
-
Tue
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:00, non-stop
Boeing 737-800 (73H)

Effective 2025-06-20 through 2025-09-12
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 0:50, non-stop
Boeing 737-800 (73H)

Valid until 2025-06-14
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 1:00, non-stop
Boeing 737-800 (73H)

Effective 2025-06-16 through 2025-09-13
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 1:00, non-stop
Boeing 737-800 (73H)

Effective 2025-09-14 through 2025-10-25
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 1:00, non-stop
Boeing 737-800 (73H)

Effective from 2025-10-26
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 2:00, non-stop
Boeing 737-800 (73H)

Effective 2025-06-19 through 2025-09-11
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 0:50, non-stop
Boeing 737-800 (73H)

Effective 2025-06-15 through 2025-09-07
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 0:50, non-stop
Boeing 737-800 (73H)

Effective 2025-06-18 through 2025-09-10
Mon
-
Tue
-
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 0:50, non-stop
Boeing 737-800 (73H)

Effective 2025-06-19 through 2025-09-11
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 1:00, non-stop
Boeing 737-600 (736)

Valid until 2025-06-14
Mon
-
Tue
-
Wed
-
Thu
Fri
Sat
Sun
-
Duration: 1:00, non-stop
Boeing 737-800 (73H)

Effective 2025-06-20 through 2025-09-12
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 1:00, non-stop
Boeing 737-800 (73H)

Effective 2025-09-18 through 2025-10-25
Mon
-
Tue
-
Wed
-
Thu
Fri
Sat
Sun
-
Duration: 1:00, non-stop
Boeing 737-800 (73H)

Effective from 2025-10-30
Mon
-
Tue
-
Wed
-
Thu
Fri
Sat
Sun
-
Duration: 2:00, non-stop
Boeing 737-800 (73H)

Effective 2025-06-21 through 2025-09-13
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 1:00, non-stop
Boeing 737-800 (73H)

Effective 2025-09-21 through 2025-10-05
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 1:05, non-stop
Airbus A320 (320)

Effective 2025-06-24 through 2025-09-09
Mon
-
Tue
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:05, non-stop
Airbus A320 (320)

Valid until 2025-06-12
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 1:05, non-stop
Airbus A320 (320)

Effective 2025-09-18 through 2025-10-23
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 1:05, non-stop
Airbus A320 (320)

Effective 2025-09-16 through 2025-09-30
Mon
-
Tue
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:05, non-stop
Airbus A320 (320)

Valid until 2025-06-14
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 1:05, non-stop
Airbus A320 (320)

Effective 2025-09-20 through 2025-10-25
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 1:05, non-stop
Airbus A320 (320)

Effective 2025-06-21 through 2025-09-13
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 1:05, non-stop
Airbus A320 (320)

Effective 2025-06-19 through 2025-09-11
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 1:05, non-stop
Airbus A320 (320)

23:10

01:15(+1)
Effective 2025-06-20 through 2025-09-14
Mon
-
Tue
-
Wed
Thu
-
Fri
Sat
-
Sun
Duration: 1:05, non-stop
Airbus A320 (320)
The flight arrives 1 day after departure.

Effective 2025-06-24 through 2025-09-09
Mon
-
Tue
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:05, non-stop
Airbus A320 (320)

Direct Codeshare Flights:

Effective 2025-09-21 through 2025-10-05
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Codeshare flight, operated by Vueling. (VY 6031)
Duration: 1:05, non-stop
Airbus A320 (320)

Effective 2025-06-24 through 2025-09-09
Mon
-
Tue
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by Vueling. (VY 6031)
Duration: 1:05, non-stop
Airbus A320 (320)

Valid until 2025-06-12
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by Vueling. (VY 6031)
Duration: 1:05, non-stop
Airbus A320 (320)

Effective 2025-09-18 through 2025-10-23
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by Vueling. (VY 6031)
Duration: 1:05, non-stop
Airbus A320 (320)

Effective 2025-09-16 through 2025-09-30
Mon
-
Tue
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by Vueling. (VY 6031)
Duration: 1:05, non-stop
Airbus A320 (320)

Valid until 2025-06-14
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Codeshare flight, operated by Vueling. (VY 6031)
Duration: 1:05, non-stop
Airbus A320 (320)

Effective 2025-09-20 through 2025-10-25
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Codeshare flight, operated by Vueling. (VY 6031)
Duration: 1:05, non-stop
Airbus A320 (320)

Effective 2025-06-21 through 2025-09-13
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Codeshare flight, operated by Vueling. (VY 6031)
Duration: 1:05, non-stop
Airbus A320 (320)

Effective 2025-06-19 through 2025-09-11
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by Vueling. (VY 6031)
Duration: 1:05, non-stop
Airbus A320 (320)

23:10

01:15(+1)
Effective 2025-06-20 through 2025-09-14
Mon
-
Tue
-
Wed
Thu
-
Fri
Sat
-
Sun
Codeshare flight, operated by Vueling. (VY 6031)
Duration: 1:05, non-stop
Airbus A320 (320)
The flight arrives 1 day after departure.

Effective 2025-06-24 through 2025-09-09
Mon
-
Tue
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by Vueling. (VY 6033)
Duration: 1:05, non-stop
Airbus A320 (320)
Ad mobi box here (300x250px) 6815354179 M FlightInfo Bottom Box
Parallax here ORN-ALC
  • An international route departing from Oran airport, Algeria (ORN) and arriving at Alicante airport, Spain (ALC).
  • The flight distance is 183 miles, or 295 km.
  • The timezone of both the departure and the arrival airports is UTC+1 . Current time at both airports is (loading...).
  • For direct flights, the flight time varies between 0:50 and 2:00.